Agriculture
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| University of Stellenbosch |
2006 |
NDA: An Assessment of the Status of Agro-logistics in South Africa |
| Wegro Farming |
2006 |
Determination of the financial lost suffered by Pineapple Farmers using defected pesticides |
| DBSA |
2006 |
Financial and Economic Viability of the Hoedspruit Sugar Mill |
| Green Dream Projects |
2006 |
Financial Analysis of Hilltop Farm to establish its Financial Viability |
| SAIEA |
2007 |
Strategic Environmental Assessment for the MID-ZAMBEZI programme on agricultural water management for food security |
| Rhodes Fruit Group |
2008 |
Impact Study of the Proposed Expansion of Pineapple Production on the Kingdom of Swaziland |
| Onder Pro Aktief |
2010 |
Economic Impact Regarding Onderberg Land Claim |
| Econdow CC |
2010 |
Assessment of the Economic Impact of the Land Claims on the Nkomazi/Onderberg Area |
| National Agricultural Marketing Council (NAMC) |
2010 |
Comparative Advantage Of The Sugar Industry |
| Aurecon South Africa (Pty) Ltd. |
2011 |
Vaalharts Feasibility Study And Business Plan – Project 105567 |
| Burger & Du Plessis |
2011 |
Cofamoza Irrigation Project: Potential Supplementary Food Crops and Business Model |
| ESKOM Holdings SOC Limited |
2012 |
Valuation of the Farm: Witkop of Mr. Koos Venter which will be impacted on by the Medupi Borutho Witkop 2X400KV Power line and Substation, Limpopo Province according to the Discounted Future Net Income Method |
| SA Wine Industry |
2014 |
Macro-economic Impact of the Wine Industry on the South African Economy (also with reference to the Impacts on the Western Cape) – Order No 4169 |
| National Agricultural Marketing Council (NAMC) |
2014 |
Analysis of the South African Broiler Industry |
| B&M Analysts SA (Pty) Ltd. |
2015 |
Economic Impact Assessment of the revision of the South African Sugar Act |
Water
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| Water Research Commission (WRC) |
2001 |
Cost-Benefit Analyses of selected WRC Research Projects – Phase 2 |
| Economic Project Evaluation (EPE) |
2001 |
Thukela Water Project: Decision Support Phase: Reserve Determination Model |
| Economic Project Evaluation (EPE) |
2002 |
Uganda Rural Towns Water Supply and Sanitation Study |
| Water Research Commission (WRC) |
2002 |
Investigation of the Supportive Role of the Market Mechanism in Implementing the Provisions of the New Water Act in Order to Achieve Efficient and Equitable Water Utilization |
| Economic Project Evaluation (EPE) |
2003 |
Thukela Water Project: Decision Support Phase: Reserve Determination Model – Phase 2 |
| Working for Water |
2003 |
Analysis of the Economic Impacts of the Working for Water Program |
| Water Research Commission (WRC) |
2004 |
Investigation of the Supportive Role of the Market Mechanism in Implementing the Provisions of the New Water Act in Order to Achieve Efficient and Equitable Water Utilization |
| Economic Project Evaluation (EPE) |
2004 |
Groot Letaba: Value of Water |
| BKS |
2004 |
Van der Kloof Dam Study |
| IRR Catchment Consultants |
2004 |
Economic Returns of the Use of Water from the Mhlatuze |
| SIDA Leakage Management Project |
2004 |
Nam Water: SIDA Water Leakage Project |
| Tlou & Mallory Engineering and Management Services (Main client – DWAF) |
2005 |
High Confidence Reserve Determination of Letaba and Komati River Catchment: Project Management’s Component and Impact of Reserve on Socio-Economic Conditions |
| Water Research Commission (WRC) |
2005, 2006, 2007 |
Econometric Model to Predict the Effect that various Water Resource management Scenarios would have on South Africa’s Economic Development (2005, 2006 and 2007) |
| IWMI |
2005 |
Balancing Equity, Productivity and Sustainability in a Water-Scarce River Basin: The Case of the Olifants River Basin in South Africa |
| Coastal & Environmental Services |
2005 |
Kromme/Seekoei Reserve Determination Study |
| Water for Africa |
2006 |
Undertake An Assessment Of The Current Water Allocation Status And Potential For Establishing Viable Water Using Enterprises In The Olifants And Inkomati WFSP/WRM/CON) |
| CES |
2006 |
Kromme/Seekoei Reserve Determination Study |
| Iliso Consulting (Pty) Ltd |
2007 |
Development of a Draft Water Allocation Plan to guide compulsory licensing in the Mhlatuze Catchment |
| BKS |
2007 |
Feasibility studies and preparation of tender documents for future investments for ATHI water services board |
| Southern African Institute for Environmental Assessment (SAIEA) |
2007 |
Strategic Environmental Assessment for the MID-ZAMBEZI programme on agricultural water management for food security |
| Plancenter Ltd. |
2007 |
Europe Aid/120802/D/SV/ZA/5-Comprehensive Study of Maputo River |
| Pegasys Strategy & Development |
2007 |
Feasibility study on the Establishment of Water Use Efficiency Charge Funding Mechanisms and Warehousing of Fund to Support the Implementation of Water Conservation and Demand Management Measures to Improve Water Use efficiency in all |
| Pegasys Strategy & Development |
2007 |
Maximize benefit to cost ratio of water resources monitoring programmes in South Africa: Phase 1RHP, NMMP, NGQMP, RFQMP |
| Water for Africa |
2008 |
Mokolo Intermediate Reserve Study |
| Water for Africa |
2008 |
Comprehensive Determination of the Reserve for the Inkomati WMA |
| Iliso Consulting |
2008 |
Feasibility Study of the Potential for Sustainable Water Resources Development in the Molopo-Nossob Watercourse |
| Water for Africa |
2008 |
Comprehensive Determination Study for the Integrated Vaal River System: Upper Vaal Water Management Area |
| BKS |
2008 |
Beira Stormwater Study |
| KNPSF/Bigen Africa |
2008 |
CBA Analysis of Further Water Augmentation in the Komati and Extension and Updating of the Current Database of the Komati WMA |
| NEPID Consultants |
2008/2009 |
Development of an Ecological Water Requirement Policy and Water Management Plan to Implement the Ecological Water Requirement Policy for the Komati River Basin |
| Water for Africa |
2009 |
Water Determination Study for the Outeniqua Municipality Areas |
| Golder Associates |
2010 |
Comprehensive Determination Study For The Integrated Vaal River System: Middle And Lower Vaal Water Management Areas |
| Nemai Consulting CC |
2010 |
Mokolo Crocodile-West Water Augmentation Project |
| River for Africa eFlows Consulting |
2010 |
Progressive Realisation of the Inco-Maputu Agreement (PRIMA), Intergrated Water Resource Management Project (Phase 1) |
| Rivers For Africa (Pty) Ltd |
2010 |
Comprehensive Determination Study for the Integrated Vaal River System: Upper Vaal Water Management Area |
| BKS |
2010 |
Groot Letaba River Water Resources Development Project Post Feasibility Bridging Studies (GLRWRDP) – Post Feasibility Bridging Studies |
| WRP Consulting Engineers (Pty) Ltd. |
2011 |
Classification of Significant Water Resources (River, Wetlands, Groundwater and Lakes) in the Upper, Middle and Lower Vaal Water Management Areas (WMA) 8,9,10 |
| Aurecon South Africa (Pty) Ltd. |
2011 |
Vaalharts Feasibility Study And Business Plan – Project 105567 |
| Burger & Du Plessis Associates (main client: The Maputo Provincial Directorate of Agriculture) |
2011-2012 |
Cofamoza Irrigation Project: Potential Supplementary Food Crops and Business Model |
| Aurecon AMEI (Pty) Ltd. |
2012 |
Data Compilation and Pilot Applications of the Nile Basin Decision Support |
| Bigen Africa Services (Pty) Ltd. |
2012 |
The macroeconomic impacts of water allocation reform in the Nkomazi region and Middle Crocodile and the CBA of the water augmentation option |
| Jacana Environmentals cc. |
2012 |
Macro and Micro-Economic Impact Analysis and Cost Benefit Analysis of the Overvaal Project |
| Aurecon AMEI (Pty) Ltd. |
2012 |
Limpopo River Basin Monograph Study |
| NEMAI Consulting cc. |
May 2012 – October 2012 |
Ncwabeni Off-Channel Storage Dam: Economic Study |
| Department of Water Affairs (DWA) |
2012 |
Cost Benefit Analysis For Water Monitoring And Information – Project Number: WP10340 |
| River for Africa eFlows Consulting (Pty) Ltd. |
2012/2013 |
The Classification, Comprehensive Reserve And Resource Quality Objectives (RQO) Determination Of Water Resources In The Mvoti To Umzimkulu Water Management Area (WMA): WMA 11 – July to August 2012 |
| River for Africa eFlows Consulting (Pty) Ltd. |
2012/2013 |
Classification of Water Resources and Determination of the Resource Quality Objectives in the Letaba Catchment |
| Tlou Consulting (Pty) Ltd. (Main client: South African Local Government Association (SALGA) |
2013 |
The Development of Water Conservation and Demand Management Revolving Fund Framework |
| Golder Associates Africa (Pty) Ltd. |
2013 |
Orange River Reconciliation – Task 9: Value of Irrigation Water |
| Water Research Commission |
2014 |
Short-Term Project To Be Funded By Water Research Commission: Updating Of Surrogate And Shadow Prices For The Cost Benefit Analysis Manual With Special Reference To Water Resource Development – Project No: K8/1044//1 |
| Aurecon Amei (Pty) Ltd. |
2014 |
Preparation of the Water Management and Development Project (WMDP) – Development of a Pilot Catchment Management Plan in the Kyoga WMZ |
| Iliso Consulting (Proprietary) Limited |
2014 |
Environmental Impact Assessment for the proposed Mzimvubu Water Project |
| Tlou Consulting (Pty) Ltd. |
2014 |
The Reserve Determination Study for the Usuthu Mhlatuze WMA for the Department of Water Affairs |
| Scherman Colloty & Associates |
2014 |
The Preliminary Reserve Determination studies for selected Surface Water, Groundwater, Estuaries and Wetlands in the Gouritz WMA |
| Rivers for Africa |
August 2015 – December 2015 |
Supplementary Social Assessment in support of the study to investigate wastewater disposal options for Ethekwini Metropolitan Municipality that are aligned with the Classification Process |
Energy
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| Economic Project Evaluation (EPE) |
2001 |
PBMR Macroeconomic Analysis Review |
| Eskom |
2001 |
Eskom’s Market Building Initiative: A Macroeconomic Assessment |
| Coega Development Corporation |
2001 |
Macroeconomic impact of the construction of an Aluminium Smelter in the Coega IDZ |
| Eskom |
2002 |
Macroeconomic Impact of the Restructuring/Privatization of Eskom with Specific Reference to Electricity Real Price Increases |
| Economic Project Evaluation (EPE) |
2002 |
Windhoek Aquifer Recharge – Economic Evaluation |
| eThekwini Municipality |
2004 |
eThekwini Metro SAM |
| eThekwini Municipality |
2004 |
Expansion of Durban’s International Convention Centre & Training for use of SAMs |
| COWI Consulting Engineers A/S |
2004 |
DME-DANCED Capacity Building in Energy Efficiency & Renewable Energy |
| ESKOM |
2004 |
Economic Impact Assessment of the Full-scale Implementation of underground coal gasification and co-firing at Majuba Power Station |
| PBMR |
2004 |
Macroeconomic Impact Assessment of the Production of Pebble Bed Modular Reactors |
| ACER (Africa) Environmental Management Consultants |
2007 |
Gamma-Grass Ridge 765KV Transmission Power Lines (x2) and Gamma Sub-Station |
| Department of Economic Development, Environment & Tourism, Limpopo Provincial Government |
2007 |
Macroeconomic Impact Assessment of the Construction of a new Coal-Powered Station and the Expansion of Grootgeluk Coal Mine at Lephalale |
| Limpopo Provincial Government |
2007 |
Macroeconomic Impact Assessment of the Construction of a new Coal-Powered Station and the Expansion of Grootgeluk Coal Mine at Lephalale |
| Thabile Engineering |
2008 |
ESKOM Planning Methodology for Network Master Plans and Network Development Plant – Load Forecast and Strategic Study |
| The Royal Danish Embassy |
2008/2009 |
Comprehensive Design of the South African Renewable Energy Sectoral Business Case |
| Iliso Consulting Engineers |
2009 |
Umfolozi Empangeni 765KV Transmission Line and Substation Environmental Impact Assessment |
| Thabile Engineering |
2010 |
Economic Modelling for theElectricity Load Forecast and Strategic Study of the Free State and Karoo Network Master Plan |
| Vale Mozambique Limitada |
2010 |
Macroeconomic Impact Assessment of the Construction of the Proposed New Vale Coal Mine and Coal-Fired Power Station – Application of the Social Accounting Matrix for Mozambique |
| National Energy Regulator of South Africa (NERSA) |
2010 |
Development and Implementation of a Model to be used for Economic Impact Assessment of Regulatory Decisions taken by NERSA |
| Bembani Sustainability Training (Pty) Ltd. |
2010-2011 |
Economic Impact Assessment Study for the Proposed Invubu-Theta 400kv Transmission Power Line |
| Aurecon |
2010 |
Master Plan for Warmbad MSA (Project No 105611) |
| Imani Development (South Africa) (Pty) Ltd. |
2011 |
Eskom Venus Sigma Hector Ariadne Powerlines |
| Sishen Iron Ore Company (Pty) Ltd |
2011 |
Determine the Economic Footprint of Kumba in the Northern Cape and the Rest of South Africa – Contract Number 460 500 1409 |
| Sishen Iron Ore Company (Pty) Ltd |
2011 |
Determine the Economic Footprint of Kumba in the Northern Cape and the Rest of South Africa – Contract Number 460 500 1409 |
| BAAGI Environmental Consultancy cc. |
2011 |
Economic Study of the Ariadne-Venus Transmission Project in KZN |
| Bembani Sustainability Training (Pty) Ltd. |
2011 |
Economic Impact Assessment Study for the proposed Invubu-Theta 400kv Transmission Power Line |
| ESKOM Holdings SOC Limited |
2012 |
Valuation of the Farm: Witkop of Mr. Koos Venter which will be impacted on by the Medupi Borutho Witkop 2X400KV Power line and Substation, Limpopo Province according to the Discounted Future Net Income Method |
| GIBB |
2013 |
EIA and EMP for the Proposed Eskom Conventional Nuclear Power Station and Associated Infrastructure |
| NERSA |
November 2015 – January 2016 |
Economic Impact Assessment Concerning the SASOL Regulatory Agreement |
Manufacturing
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| Standard Bank |
2006 |
The Economic and Social Impacts of Investment Projects funded by the Banking Sector of South Africa |
| University of Stellenbosch |
2007/2008/2009/2010/2011/2012/2013 |
Transnet Freight Demand Model Update |
| South African Wine Industry (SAWIS) |
2009 |
“Impak van die wynbedryf in die Wes-Kaap Provinsie” (Impact of wine industry in the Western Cape Province) |
| University of Stellenbosch (Department of Trade and Industry) |
2009 |
Impact of Transnet on the South African economy |
| PetroSA |
2010 |
Projection of Fuel Imports and the Impact on the South African Economy from 2005-2020 |
| DBSA |
January 2010 – current |
Macroeconomic Impact Assessment of Eskom’s Capital Investment Programme and Subsequent Economic Impacts on the South African Economy of Costs Incurred through Different Funding Options |
| Imani Development (South Africa) (Pty) Ltd. |
2011 |
Economic Impact Study of Upgrading the Sani Pass and Mokhotlong-Sani Top Roads |
| Burger & Du Plessis Associates (main client: The Maputo Provincial Directorate of Agriculture) |
2011 |
Cofamoza Irrigation Project: Potential Supplementary Food Crops and Business Model |
| Thabile Engineering |
2011 |
Development of Network Master Plans in the Welkom/Betlehem and Rustenburg FSA’s |
| Standard Bank of Southern Africa |
2011 |
Annualizing the Economic Impact of the Financial Sector in general and that of Standard Bank in particular, on the South Africa Economy |
| GAIN |
2012 |
South African 30 year demand forecast and Africa transportation infrastructure update |
| University of Cape Town – Development Policy Research Unit (DPRU) |
August 2012 – November 2012 |
Employment Promotion Programme Phase III: Analyzing and Optimizing the metal industry as well as the economic impact of implementing export measures to reduce on-going job losses and plant closures in the foundry and scrap metals industries |
| Focus Project Management (Pty) Ltd. |
June 2012-May 2013 |
50-year Integrated Master Plan and business Plan for the Richards Bay IDC and Special Economic Zone Project |
| Export Credit Insurance Corporation of South Africa Ltd. (ECIC) |
2013 |
Review, Update and Modification of the Economic Impact Assessment Model |
| Swaziland Sugar Association (sponsorship by UNDP; Ministry of Economic Development and Planning) |
2013 |
Conducting Economic Impact Analysis of the Sugar Industry and its linkage effect on the on the other Economic Sectors of the Economy of the Kingdom of Swaziland – A Social Accounting Matrix Approach |
| DBSA |
2014 |
Training in the Theory and Application of the Cost-Benefit Analysis (CBA) as part of Multi Criteria Decision Analysis (MCDA) |
| Futurelead |
2014 |
Macroeconomic Impact Model for Western Cape |
Mining
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| Golder Associates |
2003 |
Macroeconomic Impact of the Conversion of the Ngodwana Mill |
| Golder Associates |
2004 |
Macroeconomic Impact of the Conversion of the Ngodwana Mill |
| Department of Economic Development, Environment & Tourism, Limpopo Provincial Government |
2007 |
Macroeconomic Impact Assessment of the Construction of a new Coal-Powered Station and the Expansion of Grootgeluk Coal Mine at Lephalale |
| Golder Associates Africa |
2007 |
Macroeconomic Assessment of the Expansion of the Mafube Coal Mine, Mpumalanga |
| Naledi Development |
2008/2009 |
Coal of Africa Limited Colliery Projects |
| Standard Bank of South Africa Ltd. (Main client: Vale Mozambique Limitada) |
2009 |
Macroeconomic Impact Assessment Of The Construction Of The Proposed New Vale Coal Mine And Coal-Fired Power Station – Application Of The Social Accounting Matrix For Mozambique |
| Jacana Environmental cc |
2010 |
Macroeconomic Impact Analysis and Cost Benefit Analysis of the Vlakfontein Colliery |
| Jacana Environmental cc |
2010 |
Macroeconomic Impact Analysis and Cost-Benefit Analysis of the Vele Colliery |
| Southern African Institute for Steel Construction (SAISC) |
2010 |
Macro-Economic Impact Assessment Of The Construction Of A Mine |
| Lexshell 126 General Trading (Pty) Ltd/Savannah Environmental (Pty) Ltd. |
2010 |
Macro-economic Impact Analysis and Cost Benefit Analysis of the Sekoko Coal Waterberg Project |
| Jacana Environmentals cc. |
2011 – 2012 |
Macro-Economic Impact Assessment: Makhado Colliery Project |
| Jacana Environmentals cc. (main client: Optimum Coal Holdings (Pty) Ltd.) |
2011 |
Macro and Micro-Economic Impact Analysis and Cost Benefit Analysis of the Overvaal Project |
| Jacana Environmentals cc. |
2012 |
Macro and Micro-Economic Impact Analysis and Cost Benefit Analysis of the Overvaal Project |
| Savannah Environmental (Pty) Ltd. |
2013 |
Environmental Impact Assessment and Environmental Management Programme for Mining rights Amendment for the Sekoko Waterberg Mine |
| Coal of Africa Ltd. |
2013 |
Appointment as a service provider for the Mopane Project as part of the GSP Project – Socio- and Macro-Economic Assessment |
| Coal of Africa Ltd. |
2013 |
Appointment as a service provider for the Chapudi Project as part of the GSP Project – Socio- and Macro-Economic Assessment |
| Coal of Africa Ltd. |
2013 |
Appointment as a service provider for the Generaal Project as part of the GSP Project – Socio- and Macro-Economic Assessment |
| Metmar Investments and Resources Proprietary Limited |
2013 |
Socio- and Macroeconomic Impact Analysis and Cost Benefit Analysis for the Sefateng Chrome Mine |
| Savannah Environmental (Pty) Ltd. |
2014 |
Environmental Impact Assessment and Environmental Management Programme for Mining rights Amendment for the Sekoko Waterberg Mine |
| Exxaro Coal (Pty) Ltd. (Inyanda) |
2015 |
Socio-Economic Impact Assessment |
| Jacana Environmentals cc. (Main Client: PC Meyer Consulting) |
2015 |
Compilation of an Environmental Management Programme and Integrated Water Use Licence for the Dual Coal Project: Thandululo Coal Mining (Pty) Ltd. |
| Jacana Environmentals cc. |
2015 |
South32 SA Coal Holdings (Pty) Limited (Csa), Formerly Known as BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA Proposed Leandra Coal Mine Project |
Transport
|
PRINCIPLE/CLIENT
|
DATE
|
PROJECT NAME
|
| University of Stellenbosch |
2006 |
Transnet: Long Term Economic Forecast |
| Bombela Consortium Office |
2006 |
Re-assessment and update of the Macroeconomic Impact of the Gautrain |
| Mosaka Economic Consultants |
2007 |
Moloto Corridor Project |
| Roche Ltd, Consulting Group, Canada |
2007 |
Namibia Road and Educational Infrastructure – Project number 46207 |
| DBSA |
2007 |
Micro and Macro-Economic Evaluation – Durban Port |
| eThekwini Municipality |
2007/8 |
Port Economic Decision Making Framework |
| Mosaka Economic Consultants (City of Matlosana) |
2008/2010 |
Micro and Macro Economic Assessment of the Proposed Expansion on the Klerksdorp Airport |
| University of Stellenbosch (Department of Trade and Industry) |
2009 |
Impact of Transnet on the South African economy |
| eThekwini Municipality |
2010 |
Acquisition of computerised SAM based user-friendly econometric impact model – National and Mpumalanga Provincial Model |
| Savannah Environmental |
2010 |
Specialist Input To Undertake An Environmental Impact Assessment & Compile an Environmental Management Plan for the Proposed Mokopane Integration Project |
| GAIN |
2010 |
Transnet Review Study |
| Imani Development (South Africa) (Pty) Ltd. |
2011 |
Economic Impact Study of Upgrading the Sani Pass and Mokhotlong-Sani Top Roads |
| Port and Logistics Business Solutions |
2011 |
Port and Rail Infrastructure Order of Magnitude Study |
| Virtual Consulting Engineers |
2011 |
Cost-Benefit Analysis on the Dube Tradeport Site |
| GAIN |
2012 |
Freight Demand Model Update – 2013 |
| GAIN |
2012 |
South African 30 year demand forecast and Africa transportation infrastructure update |
| Transnet SOC Ltd. |
2013 & 2014 |
Macroeconomic Impact Assessments and related Modelling Services |
| GAIN (Main client: Transnet) |
2013 |
Annual Update of Transnet’s Freight Demand Model – 2013, 2014 |
| Cave Klapwijk & Associates |
2014 |
N3: Keeversfontein to Warden (De Beer’s Pass Section) – Environmental Impact Assessment – Additional work done |
| Imani Development |
2015 |
The Socio-economic Impact Assessment Exercise and the Economic Evaluation Exercise on the Swaziland Railway Link Project |
| DBSA (Main Client: Gauteng MEC of Roads and Transport) |
2015 |
Gauteng Rail Public Private Partnership (PPP) – Economic Review Model Specialist |
| AECOM SA (PTY) Ltd. |
July 2015 – August 2015 |
Moloto Corridor Feasibility Study |